Site recordScope of work
For Wycor, Nide Works is preparing two packages at CHIREC SARE Dialysis in Anderlecht: partitions and suspended ceilings, and flooring and finishes. Both quotations have been accepted; work dates remain to be agreed.
TypeHospital fit-outLocationAnderlecht · BrusselsClientWycorPROJECTW26020 · CHIREC SARE Dialyse
Our scope
Supply and installation of partitions, linings, plasterwork, suspended ceilings and associated elements, together with substrate preparation, PVC flooring, resin flooring, screeds, tiling and the finishes described in the two quotations. Each system is prepared to meet the hospital project's requirements.
Position as at 23/10/2026Reference programme
Two packages are in preparation. The start, duration and sequence of work areas will be agreed after the order is formalised, technical approvals are obtained and substrates are accepted.
- Partitions and suspended ceilingsQuotation acceptedSystem preparation and interface coordination
- Flooring and finishesQuotation acceptedTechnical selections and substrate acceptance before installation
- Work datesTo be agreed with WycorSubject to approvals and the hospital's work sequence
The programme describes agreed or provisional stages. It is not a record of completed progress.
Preparing execution
- Approval of systems, technical data sheets, samples and performance evidence before ordering.
- Acceptance of substrates: flatness, moisture, drying and levels before installation or closure.
- Coordination of partitions, ceilings and service penetrations with the other trades.
- Hospital-area sequencing, access and protection measures aligned with site operations.