Execution without supply of materials
Tasks are defined by work package. Material supply, plant, lifting and supervision are allocated in writing.
CONTRACTUAL SCOPE & EXECUTION FOLLOW-UP
For general contractors, we define the work package scope, allocation of interfaces and arrangements for recording work in writing before any team is deployed.
Drawings and revisions, quantities, specifications, location and deadline: identify useful information and points to clarify.
Activities, exclusions, supplies, equipment and pricing basis are set out in the quotation and order.
Agree sequencing, access, deliveries, inspections and coordination with the other parties.
Record progress and changes, then submit work for the approval specified in the contract.
SCOPE & PAYMENT BASIS
Tasks are defined by work package. Material supply, plant, lifting and supervision are allocated in writing.
A wider scope requires a specific technical and commercial assessment. It is confirmed only in an accepted quotation.
Work can be quoted at unit rates. The pricing basis defines how work is valued; it does not, on its own, determine who supplies the materials or equipment.
SITE INTERFACES
For each point, agree the allocation between Nide Works, the general contractor and the other parties in writing. Responsibilities follow the work package’s contract documents.
| Execution drawings | Current revisions, structural drawings, details, openings and handling of changes. |
|---|---|
| Supplies | Formwork materials, reinforcement, concrete, precast elements and deliveries. |
| Lifting and equipment | Crane, pump, propping, handling, operators and equipment inspections. |
| Access and interfaces | Work areas, storage, circulation and sequencing with other packages. |
| Safety and quality | Collective protection, instructions, hold points and checks before execution. |
| Quantities and approval | Quantity records, work sheets, changes, price agreements and approval of work. |
DOCUMENTED FOLLOW-UP
Depending on the agreed pricing basis, follow-up relies on recorded quantities, a progress statement or time-based work sheets. The documents to provide and their approval are specified in the contract.
Follow-up relies on site documents: agreed drawings, recorded quantities, useful photographs and work sheets. Scope changes are raised and their treatment agreed before they become additional work.
The Pro Portal displays information according to assigned permissions. Closing our assignment is distinct from acceptance of the overall project.
An incomplete dossier is enough for an initial conversation. Identify the site, planned work and deadline; an NDA can precede sharing the drawings.