NIDE WORKS

Our work and the operational management’s experience.

Engagements identified by their client, scope and status. Earlier references of the operational management are presented separately.

Nide Works assignments

Côté Colline — architectural rendering of the future project. Credit: Galika.
Architectural renderingCôté Colline — architectural rendering of the future project. Credit: Galika.

In progress · Q4 2026

Côté Colline — Auderghem

Auderghem · Brussels

Architectural rendering of the project at completion. Nide Works scope: structural works for phase 2; initial work on the foundations and the areas of the two lifts, for VDS / Peremans.

View the project brief
Heilig Hart, Tienen — architectural rendering of the future project. Source: Sweco / VK architects+engineers.
Architectural renderingHeilig Hart, Tienen — architectural rendering of the future project. Source: Sweco / VK architects+engineers.

In progress · 2026

Heilig Hart — Tienen

Tienen

Architectural rendering of the future hospital. Nide Works scope: installation of reinforcement (bars, welded mesh and punching-shear reinforcement), for Cordeel & Vanderstraeten.

View the project brief
UBICENTER II — architectural rendering of the future project. Source: ViRiX / De Gregorio & Partners.
Architectural renderingUBICENTER II — architectural rendering of the future project. Source: ViRiX / De Gregorio & Partners.

In progress · 2026

UBICENTER II — Leuven

Philipssite 7, 3000 Leuven

Architectural rendering of the overall project. Nide Works scope: structural works (columns, slabs, supplementary concrete, walls and infill of twin-wall precast panels), for Cordeel–Democo.

View the project brief
Komet, Mechelen — architectural rendering of the future project. Source: Revive.
Architectural renderingKomet, Mechelen — architectural rendering of the future project. Source: Revive.

In progress · 2026

Komet — Mechelen, phase 3A

Mechelen

Architectural rendering of the overall phase 3. Nide Works scope: structural works subcontracting on Fase 3A, starting from the slab above the car park, for IBO NV.

View the project brief
PXL BusinessHUB, Hasselt — architectural rendering of the future project. Source: Houben.
Architectural renderingPXL BusinessHUB, Hasselt — architectural rendering of the future project. Source: Houben.

In progress · 2026

PXL BusinessHUB — Hasselt

Hasselt

Architectural rendering of the overall project. Nide Works scope: foundations for the external staircase and balcony, temporary propping and the lattice-girder slab floor of phase 1, for Houben & Vanderstraeten.

View the project brief
Illustrative visualisation of the modernisation of operating rooms E1 to E6 at Saint-Luc.
IllustrationSaint-Luc — illustrative visualisation published by In Advance; it does not represent the final room layout.

UCL Saint-Luc — InAdvance

Woluwe-Saint-Lambert · Brussels · InAdvance

Hospital structural works SOP E1–E6: formwork, reinforcement, concreting and masonry (general earthworks excluded).

Active site · 2026

View the project brief
CHIREC SARE — view of the existing Sainte-Anne Saint-Remi hospital, as context for the dialysis project. Credit: CHIREC.
PhotographCHIREC SARE — view of the existing Sainte-Anne Saint-Remi hospital, as context for the dialysis project. Credit: CHIREC.

CHIREC SARE Dialysis — Anderlecht

Anderlecht · Brussels · Wycor

Supply and installation of partitions, wall linings, plasterwork, suspended ceilings and associated works, as well as substrate preparation, PVC floors, resin floors, screeds, tiling and finishes described in the two offers.

Two quotations accepted · site works in preparation

View the project brief
Visé — overview of the sand-lime block masonry under construction.
PhotographVisé — overview of the sand-lime block masonry under construction.

Batitec — Visé

Visé · Batitec

Execution of structural works for Batitec, on the Les Jardins du Canal residential project. Closure of this scope does not mean completion or handover of the overall project.

Nide Works assignment closed · 2026

View the project brief
Hollandia, Wormhout — concrete pit walls and base slabs with starter reinforcement.
PhotographHollandia, Wormhout — concrete pit walls and base slabs with starter reinforcement.

Hollandia — Wormhout (France)

Wormhout, France · Delporte

Grit-blasting pit inside an industrial hall: formwork, striking formwork and installation of welded mesh.

January 2026

View the project brief
Stock, Ath — concrete storage bays with formwork removed on the batching plant site.
PhotographStock, Ath — concrete storage bays with formwork removed on the batching plant site.

Concrete plant — Stock, Ath

Ath · Delporte

Formwork and reinforcement for Delporte, at the Stock concrete batching plant in Ath.

December 2025

View the project brief

Technical register

THEO Glasfabriek — Antwerp

Verbrande-Entrepotstraat 7 · Antwerp · D’Hulst

Structural works and façade masonry within the contractual scope agreed with D’Hulst.

Order confirmed · preparation for 2027

View the project brief

05 / PRIOR EXPERIENCE OF THE OPERATIONAL MANAGEMENT

A track record on site. Distinct references.

These references belong to the prior experience of the operational management. They are distinct from the scopes entrusted to Nide Works SComm.

Collège Saint-Pierre — façade and clock tower with the new window frames installed.
PhotographCollège Saint-Pierre — façade and clock tower with the new window frames installed.

Historical reference · 2025

Window systems — Collège Saint-Pierre, Uccle (with Bekaert)

Uccle (Brussels)

Façade and clock tower with the new windows installed. Prior experience of the operational management: window replacement, with Bekaert.

Provinciehuis Antwerpen — exterior view of the completed building.
PhotographProvinciehuis Antwerpen — exterior view of the completed building.

Historical reference · 2015

Provinciehuis Antwerpen (with Denys–Democo)

Antwerp

Exterior view of the completed building. Prior experience of the operational management: structural works, with Denys–Democo.

Schaerbeek — fitted-out attic with roof windows, radiators and interior finishes.
PhotographSchaerbeek — fitted-out attic with roof windows, radiators and interior finishes.

Historical reference · 2014

House renovation — Schaerbeek

Schaerbeek

Fitted-out attic — interior view of this renovation. Prior experience of the operational management: renovation of a house.

Xoto, Jabbeke — concrete frame with open bays and concrete delivery on site.
PhotographXoto, Jabbeke — concrete frame with open bays and concrete delivery on site.

Structural works — Xoto, Jabbeke

Jabbeke · 2025

Structural works

Poperinge — masonry and concrete walls under construction.
PhotographPoperinge — masonry and concrete walls under construction.

Residential building — Poperinge

Poperinge · 2024

New construction

Precast workshop — reinforcement cages and mesh stored near the production lines.
PhotographPrecast workshop — reinforcement cages and mesh stored near the production lines.

Precast concrete — workshop production

· 2024

Precast concrete

Structural works — overview of precast columns and walls during assembly.
PhotographStructural works — overview of precast columns and walls during assembly.

Structural works and precast installation

· 2023

Structural works

Charleroi — bridge deck reinforcement before concreting.
PhotographCharleroi — bridge deck reinforcement before concreting.

Bridge deck — Charleroi

Charleroi · 2022

Civil structure

Spa-Francorchamps — stepped concrete beams with formwork removed, stored in the yard.
PhotographSpa-Francorchamps — stepped concrete beams with formwork removed, stored in the yard.

Grandstand beams — Spa-Francorchamps

Spa-Francorchamps · 2022

Precast concrete

Liège — raft reinforcement beneath the frame of an industrial hall.
PhotographLiège — raft reinforcement beneath the frame of an industrial hall.

Structural works — Liège

Liège · 2022

Structural works

Flémalle — precast production hall, overhead cranes and production areas.
PhotographFlémalle — precast production hall, overhead cranes and production areas.

Precast concrete — Flémalle

Flémalle (Liège) · 2022

Precast concrete

Tubize — bridge deck on its supports, with temporary protection and surrounding works in progress.
PhotographTubize — bridge deck on its supports, with temporary protection and surrounding works in progress.

Bridge — Tubize (with Galère)

Tubize · 2021

Civil structure

Liège region — walls of a concrete basin, with starter reinforcement and work in progress.
PhotographLiège region — walls of a concrete basin, with starter reinforcement and work in progress.

Structural works and precast concrete — Liège region

Liège region · 2021

Structural works

Eloy site, Vielsalm — concrete walls with formwork removed, in their construction-site surroundings.
PhotographEloy site, Vielsalm — concrete walls with formwork removed, in their construction-site surroundings.

Structural works — Eloy site, Vielsalm

Vielsalm · 2021

Structural works

Antwerp — concrete walls, formwork and reinforcement of the structure in progress.
PhotographAntwerp — concrete walls, formwork and reinforcement of the structure in progress.

Bridge — Antwerp (with BAM)

Antwerp · 2020

Civil structure

Ghent — line of columns and precast elements of the hall being assembled.
PhotographGhent — line of columns and precast elements of the hall being assembled.

Structural works — industrial hall, Ghent (with Cordeel)

Ghent · 2019

Structural works

Namur — concrete slab and structure under construction.
PhotographNamur — concrete slab and structure under construction.

Namur railway station (with Franki)

Namur · 2018

Structural works

Diksmuide — foundation formwork and reinforcement on site.
PhotographDiksmuide — foundation formwork and reinforcement on site.

Structural works — Diksmuide

Diksmuide · 2018

Structural works

Roundabout — ring-shaped reinforcement between the kerbs, before concreting the carriageway.
PhotographRoundabout — ring-shaped reinforcement between the kerbs, before concreting the carriageway.

Roundabout — road civil works

Belgium · 2018

Civil engineering

Yara, Tertre — the concrete tank at dusk, with formwork at the top.
PhotographYara, Tertre — the concrete tank at dusk, with formwork at the top.

Yara storage tank — Tertre (with BESIX)

Tertre · 2017

Civil engineering

Lock — base-slab reinforcement at the bottom of the sheet-piled excavation.
PhotographLock — base-slab reinforcement at the bottom of the sheet-piled excavation.

Lock — large foundation slab (with Jan De Nul)

Belgium · 2017

Civil engineering

Denderleeuw — concrete piers with formwork removed beside the railway line.
PhotographDenderleeuw — concrete piers with formwork removed beside the railway line.

Railway bridge — Denderleeuw (with BAM)

Denderleeuw · 2016

Civil structure

Wastewater treatment plant — concrete walls and upper slab cast; the surrounding area remains under construction.
PhotographWastewater treatment plant — concrete walls and upper slab cast; the surrounding area remains under construction.

Wastewater treatment plant (with Persyn)

Flanders · 2016

Civil engineering

Chaussée d’Anvers, Brussels — façade retained and shored during the conversion.
PhotographChaussée d’Anvers, Brussels — façade retained and shored during the conversion.

Conversion — Chaussée d'Anvers, Brussels

Brussels · 2016

Conversion

Wastewater treatment plant — overview of the circular basin under construction.
PhotographWastewater treatment plant — overview of the circular basin under construction.

Wastewater treatment plant and large foundation slabs

Belgium · 2015

Civil engineering

Masonry — interior view of block walls and underfloor heating preparation.
PhotographMasonry — interior view of block walls and underfloor heating preparation.

Masonry and roofing (Hannut and others)

Hannut e.a. · 2015

Masonry / Roofing

Brussels, 2014 — concrete façade panels and scaffolding on site.
PhotographBrussels, 2014 — concrete façade panels and scaffolding on site.

Structural works — 2014 sites, Brussels

Brussels · 2014

Structural works

School, Molenbeek-Saint-Jean — façade and structural works on an urban site.
PhotographSchool, Molenbeek-Saint-Jean — façade and structural works on an urban site.

Structural works — 2013 sites, Brussels

Brussels · 2013

Structural works