PROJECT BRIEF / STRUCTURAL WORKS
Komet — Mechelen, phase 3A
A structural works execution package in Mechelen.

Architectural rendering of the overall phase 3. Nide Works scope: structural works subcontracting on Fase 3A, starting from the slab above the car park, for IBO NV.
- Client / location
- IBO NV · Mechelen
- Nide Works package
- Structural works execution · Fase 3A
- Status / period
- In progress · 2026
- Reference
- 23 units · overall project

- Phase
- 3A
- Units · overall project
- 23
Nide Works scope
Our scope.
Structural works subcontracting for IBO NV in Mechelen, starting at the slab above the car park. The residential project comprises 23 units; this figure describes the overall project.
Load-bearing and facing masonry, masonry reinforcement, pointing, below-ground insulation and waterproofing, concrete and steel structural elements, propping and crane operator services within the assigned package.
Interfaces and organisation
The scope starts at the slab above the car park. Approved drawings, sequencing, beam bearings, propping, lifting and supplies are coordinated with IBO. Photographs also show the surrounding site; they do not attribute the entire project to Nide Works.