Komet — Mechelen · Fase 3A
Structural works subcontracting for IBO NV, Fase 3A, starting from the slab above the car park. The brief distinguishes the assigned scope from the overall project information.
STRUCTURAL WORKS SUBCONTRACTING · B2B
Nide Works SComm carries out subcontract work for general contractors: formwork, reinforcement, concreting, load-bearing masonry and timber frames. After reviewing the documents submitted, we identify the points to complete and the quotation timeframe.
ON-SITE EXECUTION PACKAGES
Traditional and system formwork (panel and climbing formwork) for walls, columns, slabs and special structures.
Reinforcement placed to execution drawings — meshes, cages and bent bars — in coordination with your site management.
Pouring, vibrating and finishing of concrete, including large rafts and continuous phases.
Calcium-silicate blocks, concrete blocks and bricks: load-bearing and facing masonry, for new builds and conversions.
Assembly of timber-frame structures for new builds and extensions.
PREPARATION & COMPLIANCE
We work throughout Belgium. Available staffing and the schedule are defined for each project, according to the agreed scope and existing commitments.
EXECUTION RECORDS
Structural works subcontracting for IBO NV, Fase 3A, starting from the slab above the car park. The brief distinguishes the assigned scope from the overall project information.
Structural works for Batitec in Visé. Closure of Nide Works’ scope is distinct from handover of the overall project; the brief sets out the scope and status.
Send your drawings, bill of quantities and specifications: after analysis, we confirm the documents received, any points to clarify and our deadline for submitting a quotation.