Reinforcement placement and fixing on site
Nide Works installs reinforcement to construction drawings for foundations, walls, columns, beams and slabs. The work follows your construction sequence and concrete pour schedule.
Send your reinforcement documentsThe assigned works
The scope is defined from reinforcement drawings and bar schedules. It may include bent bars, welded mesh and punching shear reinforcement.
- Identification of reinforcement and organisation of supplies by work area.
- Placement, assembly and tying to the drawings.
- Coordination of checks before formwork closure and concreting.
Preparation matched to site progress
Deliveries, storage areas and handling equipment need to follow the execution sequence. Interfaces with formwork teams, openings and construction joints are reviewed with site management.
Information for pricing
Send current drawings, reinforcement quantities, the breakdown by structure and the programme. Specify access arrangements, how steel will be delivered and the lifting equipment provided.
A documented hospital assignment
At Heilig Hart in Tienen, the Nide Works scope includes the installation of bars, mesh and punching shear reinforcement. The project sheet describes this assignment and the interfaces to coordinate before concreting.
The quotation defines the installation assigned to Nide Works and responsibility for steel supply and bending.