Braine-l'Alleud · Belgium BCE 1012.647.831 · Peppol 0208:1012647831
Nide Works site in Mechelen: walls, floor slabs and tower cranes
Structural-work subcontracting · General contractors

Structural works,
delivered with method.

Formwork, reinforcement and concreting for general contractors throughout Belgium. A defined scope, an identified team and documented follow-up.

Nide Works SComm Braine-l'Alleud · Belgium
Execution scope
Formwork · rebar · concreting · load-bearing masonry · timber frame
Site mobility
Belgium · multilingual site coordination
Documents and next steps confirmed after review Detailed bills of quantities & daywork sheets Applicable documents checked before mobilisation
Nide Works assignments

Our work, on site.

Three recent assignments: the site, our scope and photographs of the work.

Heilig Hart — site overview and foundation areas.
In progress · 2026

Heilig Hart — Tirlemont (Tienen)

Tirlemont (Tienen) · Cordeel & Vanderstraeten

For the Heilig Hart hospital project in Tienen, Nide Works installs reinforcing bars, welded mesh and punching shear reinforcement.

Planned reinforcement
≈ 2 120 t
Reinforcing bars
≈ 1 343 t
Welded mesh
≈ 777 t
View the site record →
UBICENTER II · future-project visualization. Source: ViRiX / De Gregorio & Partners. Site photographs to follow.
Planned · 2026

UBICENTER II — Leuven

Philipssite 7, 3000 Leuven · Cordeel–Democo

In Leuven, Nide Works is preparing the structural works for UBICENTER II with the Cordeel–Democo joint venture at Philipssite 7.

Planned reinforcement
61,093 t
Planned concrete
1 296,51 m³
Schedule items
25
View the site record →
August 2026 progress — overview of walls, beams, formwork and propping on the level under construction
In progress · 2026

Komet — Mechelen, phase 3A

Mechelen · IBO NV

Labour subcontracting for IBO NV in Mechelen, starting at the slab above the car park.

Phase
3A
Units · overall project
23
View the site record →

See all projects

Subcontractor prequalification

Your supplier check in 60 seconds

Essential information is immediately visible. Applicable documents are then shared through an agreed channel, never publicly.

Verifiable identity
CBE / VAT BE 1012.647.831
Structured invoicing / Peppol
Peppol ID 0208:1012647831
Execution scope
Formwork · rebar · concreting · load-bearing masonry · timber frame
Operational capacity
Up to 3 sites in parallel · up to around 20 people deployable on a single site, not automatically on each of the three sites (as of 03/08/2026)
Site mobility
Belgium · multilingual site coordination
Client traceability
Quantities, T&M sheets, progress photos and Pro Portal
The director's track record was built alongside: BESIX BAM Jan De Nul Franki Denys–Democo Persyn
Brands commonly used: Hilti Xella
What we do

Practical expertise. A clear delivery method.

Identify the work package, then see how we prepare its execution and follow-up.

Crew reinforcing a foundation slab on a major structural-work site

Structural works & subcontracting

For general contractors: formwork, reinforcement, concreting and load-bearing masonry. Scope, team and programme are confirmed before mobilisation.

Discover →
Foundations and precast floor slabs for a new build

Preparation and method

Plans, scope, materials, lifting equipment and interfaces: responsibilities agreed in writing before work starts.

Discover →
Documented monitoring of a Nide Works construction site

Traceability & Pro Portal

Bills of quantities, daywork sheets, progress photos and handover records centralised for fact-based site monitoring.

Discover →
Why Nide Works

A reliable execution partner, from take-off to handover

Nide Works was incorporated in 2024. It draws on its management team's prior professional experience, which is presented separately from assignments contracted by Nide Works.

  • Structured response — receipt, missing documents and calculation timeline confirmed after reviewing the dossier.
  • Document control — applicable documents are checked and dated for each worker.
  • Monitored execution — the programme is tracked; any deviation is reported, documented and addressed through an action plan.
Night-time reinforcement welding at the Yara Tertre siteYara Tertre — continuous-operation site
3
Sites run in parallel
20
People deployable on one site
1
Written scope to be agreed for each work package
6
Languages for site coordination

Maximum capacities declared on 03/08/2026. Deployment depends on existing commitments and must be confirmed; the maxima cannot be added together.

Site follow-up

The Nide Works Professional Portal

The portal brings together recorded hours, documents and photographs according to assigned permissions. The information shared is agreed with the project team.

  • Recorded working hours submitted for approval
  • Photographs and documents linked to the work
  • Work records and progress statements according to permissions
  • Named access to authorised projects
Open the Pro Portal Install the app Restricted access — Nide Works teams & clients
Actual Pro Portal sign-in screen, in French
Actual preview · sign-in screen in French

A structural-work package to qualify?

Send your specifications: after reviewing the dossier we confirm receipt, any missing documents and the calculation timeline.

Request a quotation