Formwork and concreting for your structural package
Nide Works undertakes formwork and concreting for general contractors. Preparation starts with your construction drawings, quantities and available work areas.
Send your formwork drawingsThe structures involved
Walls, columns, beams and slabs: a package may combine traditional formwork, system formwork and concreting. Work is organised around the structures and sequence agreed with site management.
- Preparation and assembly of formwork within the agreed package.
- Coordination with reinforcement, openings and precast elements.
- Concrete placement and formwork removal to the execution documents.
Preparing the concrete pour
Access to work areas, delivery sequences, placement equipment and pre-pour checks are coordinated before execution. Interfaces with other trades are addressed during site preparation.
Information for pricing
Send structural and formwork drawings, quantities, heights and the intended programme. Identify available formwork systems, surface finish requirements and the proposed allocation of lifting and supply resources.
Documented assignments
The Komet Fase 3A and UBICENTER II project sheets describe the structures and work entrusted to Nide Works, with photographs of site execution.
Responsibility for materials, formwork, lifting and other resources is set out in the quotation.